You have now bought an old building in need of renovation and would like to start renovating the basement. Since you have already re-laid all the pipes and electrical cables, all you really need to do now is work on the walls. For this purpose, you can create a handsome basement very quickly with ready-made plaster and a little skill.

Refurbish your basement walls with finished plaster.
Refurbish your basement walls with finished plaster.

What you need:

  • Tarpaulin
  • duct tape
  • Wire brush
  • Peel bars
  • Trowel
  • Abrading board
  • Finished plaster

Plan and prepare the basement renovation

If you want to carry out your basement renovation with finished plaster, you should protect your new screed floor in advance. It would also make sense to have the necessary tools ready. Then you should also determine the exact number of square meters so that you then know how much ready-made plaster to buy.

  • After you have your walls have measured in the basement and now have the right amount of finished plaster for your basement renovation on site, you should cover your floor. So get tarpaulins from your trusted hardware store, double them up and cover the floor with the tarpaulin. Then glue the sides to the baseboards.
  • In the next step, screw three peel-off rails to each wall. You can then pull off the plaster evenly over these rails with a long aluminum batten. The rails are installed vertically and should be checked with a spirit level to ensure that the wall coverings can then be applied straight.
  • Remember that the height of the rails will later be synonymous with the thickness of your wall coverings. When the rails are hanging, you can brush the walls with a large wire brush.

Mix and distribute the finished plaster

  • After the walls have been thoroughly freed of old wall coverings, you can then apply Tiefengrund. When the deep primer has pulled in correctly, you can use the Plastering kick off. So get your masonry bucket out of the basement and mix the finished plaster with a little water.
  • Plastering concrete in the basement - this is how you proceed

    If you want to plaster your concrete walls in the basement, this is easiest with ...

  • Then throw the plaster on the wall with a trowel and pull it off with the aluminum lath over the peeling rails. You keep doing this until all the walls are finished with plaster.
  • At the end of your basement renovation with finished plaster, remove the peel-off rails and properly plaster the resulting joints. After the plaster has tightened a bit, take a rubbing board and rub all the walls with a little water.

Do not make the finished plaster too thin.