Build the foundation for a garden grill yourself

instagram viewer

To prevent the embers from your garden grill from damaging the ground, you should build a foundation. With a little skill for manual work, the same should be made quickly.

Carry out excavations for the foundation

Since you want to build a barbecue that is built from bricks yourself, you should go for one foundation made of concrete. It is important that you make sure in advance that no cables or other objects run under your future foundation.

  1. First of all, you should mark the place with spray paint where you want to build the foundation for your garden grill yourself. Try to draw the straight lines as possible.
  2. Before you start digging, you should consider how deep you actually have to dig. You should dig about six inches deeper than your floor slab will then be thick. When you have finished the calculations, you can use the spade to dig a hole.
  3. Next, you put small steel meshes in the foundation hole and on the sides as a reinforcement. Since you are pouring the sides and the bottom plate in one piece, you have to board everything well.
  4. For this purpose, there are special formwork panels that you need to attach so that the subsequently poured concrete also runs in the direction you intended. Remember that you will then build the barbecue on the side walls. So choose the right wall thickness.
  5. Build a water treading pool yourself

    If you want to really tread water, you shouldn't mess, but plop. …

Potting the structure for the garden grill

  1. Now that you have properly boarded the future foundation for your garden grill, you can pour the same with ready-mixed concrete. You can buy the ready-mixed concrete at your trusted hardware store. The same is then mixed with water in a mason's bucket and poured into the formwork.
  2. You should stir the concrete with a long wire during the pouring process to ensure that large air bubbles do not form. Then the foundation for the garden grill should dry out properly for about 3 days before you can remove the casing and complete the work.

When attaching the formwork, you should make sure that there are no cracks in the formwork where the concrete could later leak.